TDI

Cementing Operations

Duration

5 Days

Start Date

13-Oct-2025

End Date

17-Oct-2025

Venue

LONDON – UK

price

1690 KD

20% discount for group above 5 attendees

 

Course Overview

This course provides an in-depth understanding of cementing operations in the oil and gas industry, covering both primary and remedial cementing practices. Participants will learn about cementing equipment, slurry design, placement techniques, well integrity, and operational challenges. Emphasis is placed on the engineering, planning, execution, and troubleshooting of cementing jobs to ensure wellbore integrity and zonal isolation across the life cycle of the well.

Course Objectives

By the end of this course, participants will be able to:

  • Understand the fundamental principles and objectives of cementing operations.
  • Design and evaluate cement slurries for various wellbore conditions.
  • Select and use cementing equipment and materials effectively.
  • Plan and execute primary and remedial cementing jobs.
  • Address operational challenges such as losses, gas migration, and poor zonal isolation.
  • Ensure well integrity through proper cementing practices and post-job evaluation.

Who Should Attend

  • Drilling, completion, and production engineers
  • Cementing service company personnel
  • Field supervisors and wellsite engineers
  • Well integrity and operations personnel
  • Petroleum engineering students and trainees
  • Anyone involved in the planning and execution of cementing operations

Course Outline

Introduction to Cementing Operations

  • Objectives of Cementing: Zonal Isolation, Casing Support, Well Integrity
  • Overview of Cementing Types: Primary, Remedial, Plug, Squeeze
  • Wellbore Conditions and Cementing Considerations

Cement Slurry Design and Properties

  • Cement Types, Additives, and Chemical Reactions
  • Slurry Properties: Density, Rheology, Thickening Time, Fluid Loss, Free Water
  • Laboratory Testing and QA/QC Procedures
  • Design Software and Field Application Guidelines

Cementing Equipment and Job Planning

  • Cementing Units, Mixing Systems, Pumps, and Manifolds
  • Casing Accessories: Centralizers, Scratchers, Float Equipment
  • Job Planning: Pre-Job Simulation, Spacers, Displacement, Volumes
  • Pressure Testing and Risk Assessment

Execution and Evaluation of Cementing Jobs

  • Surface and Subsurface Cementing Techniques
  • Displacement Efficiency and Placement Best Practices
  • Job Monitoring and Real-Time Adjustments
  • Post-Job Evaluation: CBL, VDL, Ultrasonic Logs, Pressure Tests

Remedial Cementing and Troubleshooting

  • Causes and Consequences of Cementing Failures
  • Squeeze Cementing, Plug Setting, and Cementing Through Tubing
  • Lost Circulation and Gas Migration Control
  • Cementing Best Practices and Lessons Learned