TDI

Completion & Workover

Duration

5 Days

Start Date

19-Jan-25

End Date

23-Jan-25

Venue

Madrid– SPAIN

price

1690 KD

20% discount for group above 5 attendees

Introduction:

The “Completion & Workover” course provides participants with an in-depth understanding of well completion and workover operations, essential for maximizing oil and gas production efficiency. This course will cover the fundamentals, advanced techniques, and latest industry best practices, focusing on the critical aspects of well completion and maintenance to ensure safe, efficient, and cost-effective operations. Participants will gain insights into completion tools, well intervention methods, workover strategies, and troubleshooting common issues.

Program Objectives:

By the end of this course, participants will be able to:

  1. Understand the principles and types of well completion techniques and their application in various geological conditions.
  2. Identify and evaluate completion tools and equipment essential for successful well completion and workover operations.
  3. Develop skills in well intervention techniques, including remedial work, stimulation, and perfora
  4. Apply workover strategies to optimize well performance and extend the well’s productive life.
  5. Diagnose common problems during well completion and workover, along with effective troubleshooting tec
  6. Ensure adherence to health, safety, and environmental (HSE) standards during completion and workover ac

Who Should Attend?

This training course is suitable for a wide range of professionals but will greatly benefit:

  • Petroleum Engineers
  • Production Engineers
  • Drilling Engineers
  • Completion Engineers
  • Oil Field Technical Staff

Course Outline:

Module 1: Fundamentals of Well Completion

 

  • Overview of Well Completion Types (Open Hole, Cased Hole, Multilateral, e)
  • Completion Design Considerations and Criteria
  • Introduction to Completion Fluids
  • Health, Safety, and Environmental Considerations

Module 2: Completion Equipment and Tools

  • Packers, Liners, and Tubing
  • Subsurface Safety Valves and Accessories
  • Wellhead and Christmas Tree Components
  • Perforation Techniques and Tools

Module 3: Workover Techniques

  • Definition and Purpose of Workover Operations
  • Types of Workover (Routine, Major, and Wellbore Intervention)
  • Tubing Removal and Replacement Techniques
  • Casing Repair and Sand Control Measures

Module 4: Well Intervention and Stimulation

  • Introduction  to   Well   Stimulation   Techniques   (Hydraulic   Fracturing, Acidizing, etc.)
  • Wireline, Coiled Tubing, and Snubbing Operations
  • Reservoir Pressure Management and Artificial Lift

Module 5: Troubleshooting and Problem Resolution

  • Identification of Common Well Completion and Workover Issues
  • Diagnosing and Mitigating Formation Damage
  • Managing Sand, Scale, and Corrosion
  • Well Control during Workover Operations

Module 6: Safety Standards and Best Practices

  • HSE Protocols for Workover and Completion Operations
  • Risk Assessment and Hazard Control
  • Emergency Response and Incident Management